Industrial

Structural repair, flooring, doors, cladding and external works to industrial units and warehouses across Yorkshire, phased around live operations.

In industrial work the building is earning money while you are working in it. A day of unplanned downtime usually costs the occupier more than a week of the construction does, which makes the programme the most important document on the job.

We carry out structural repair, flooring, doors, cladding, partitioning and external works to industrial units, workshops and warehouses across Yorkshire.


Constraints

What this sector demands

Every sector brings its own conditions. These are the ones that shape how a job here has to be run.

  • Live operations Segregation, traffic management and method statements that account for forklift and HGV movements, not just our own.
  • Shutdown windows Where work needs the area down, it gets planned into shutdown periods and resourced to finish inside them.
  • Working at height Roof and cladding work with the right access equipment and fragile-surface precautions, on buildings that were often not designed for maintenance access.
  • Asbestos cement Common in industrial roofs and cladding. Surveyed and correctly classified before anything is touched.

How it runs

An industrial job, stage by stage

  1. Survey around production

    Walked with your maintenance or operations lead, because access and shutdown windows shape the job more than the building does.

  2. Shutdown planning

    Where a shutdown is needed, the programme is built to it and agreed in advance. Where it is not, the work is phased around live operations with segregation that actually holds.

  3. Permits and isolations

    Permit to work, hot works permits, isolations and lock-off procedures agreed with your team before anyone starts, and worked to rather than signed and filed.

  4. Structural and fabric work

    Cladding, roof sheets, structural repair, flooring, doors and external works — much of it on 1960s to 1980s portal frame where an honest survey is what separates a cosmetic job from a structural one.

  5. Delivery around traffic

    Forklift routes, HGV movements and yard traffic segregated from the works, because on a live industrial site the vehicles are the main hazard.

  6. Handover

    The area released back clean and operational, with certificates, test results and any warranties handed over.

What we need before we can price it

Not all of it, and not on day one. But the more of this we have before the site visit, the closer the first number is to the final one — and the sooner we can tell you if we are the wrong firm for the job.

No prices appear on this site. A construction figure published without seeing the building, the ground and the specification is a guess, and a guess helps nobody.

Common questions

Questions industrial clients ask

Can you work without shutting the unit down?

Usually, with phasing and proper segregation. Where a shutdown is genuinely needed — and sometimes it is, for safety rather than convenience — we say so early enough for you to plan it rather than three days before.

Our roof sheets are original. Should we be worried about asbestos?

On a unit of that age it is a real possibility and a survey answers it. It changes who does the work, how it is done and what it costs, and finding out during rather than before is the expensive way round.

Is a portal frame repair a big job?

It depends what the survey finds, and on buildings of this age the survey is the job. Corrosion at the base of stanchions, purlin condition and sheeting fixings are where the real work usually is, and none of it is visible from the yard.