Building control: full plans, building notice, and what changed
The two building control routes, which Approved Documents apply, what the Building Safety Act changed in 2023 and 2024, and why the completion certificate matters.
Building control is the approval that says the work is structurally sound, insulated, drained, ventilated and safe. It applies to almost every extension, loft conversion, structural opening, new heating system and rewire, whether or not planning permission was needed.
Most homeowners meet it as a form and an inspector. Since 2023 it is more than that: the Building Safety Act put named duties on clients and contractors for all building work, not only for tall buildings.
Two routes in
A full plans application means drawings and calculations are submitted and formally checked before work starts. You get a decision, and a plans certificate. It is slower at the front and much faster afterwards, because the structural design has already been agreed rather than being argued about on site with the trench open.
A building notice means telling building control you are starting, then having the work inspected as it goes. There is no formal approval of the design, which is fine for straightforward work and a real risk on anything structural — if an inspector disagrees with what has been built, it comes out.
For anything with steels, foundations near trees or drains, or an unusual span, full plans is the route worth paying for.
What the inspector actually looks at
Building control inspects at set stages rather than continuously. On a typical extension that means excavation before concrete, foundation concrete, damp proof course and oversite, drainage before backfill, drains under test, structural steelwork and its protection, insulation before it is covered, and a final inspection.
Missing a stage is the common failure. Concrete poured over an uninspected trench can mean digging it out to prove what is underneath.
The Approved Documents
The Building Regulations set the requirements; the Approved Documents show one accepted way of meeting them. There are currently eighteen parts plus Regulation 7 on materials and workmanship, and a domestic extension typically engages eight or nine of them at once.
The parts, in full
- A Structure · B Fire safety · C Site preparation, contaminants and moisture
- D Toxic substances · E Resistance to sound · F Ventilation
- G Sanitation, hot water safety and water efficiency · H Drainage and waste
- J Combustion appliances and fuel storage · K Protection from falling and impact
- L Conservation of fuel and power · M Access to and use of buildings
- O Overheating · P Electrical safety · Q Security in dwellings
- R Infrastructure for electronic communications · S Electric vehicle charging
- T Toilet accommodation · Regulation 7 Materials and workmanship
What changed in 2023 and 2024
From 1 October 2023 the Building Safety Regulator became the sole building control authority for higher-risk buildings — residential buildings, hospitals and care homes at least 18 metres or seven storeys. Local authorities and private inspectors cannot act on those at all.
The same date brought duties that apply to everything, not just tall buildings: clients, designers, principal designers, contractors and principal contractors all now carry named responsibilities for compliance with the Building Regulations. It mirrors the CDM structure, and it means competence has to be demonstrable rather than assumed. A stricter definition of when work counts as commenced came in at the same time.
From 6 April 2024, private approved inspectors had to be registered as Registered Building Control Approvers, and individual inspectors as Registered Building Inspectors. An unregistered inspector's initial notice ceased. If someone offers to sign work off, they are on a register or they are not.
The completion certificate
The completion certificate is what proves the work was signed off, and it is what a buyer's solicitor asks for. It arrives after the final inspection, not before, and only if every stage was inspected and every outstanding item cleared.
Work that was never signed off does not become compliant by getting older. It becomes a regularisation application, at the current standard, with whatever opening up that requires.
Where this comes from
Everything on this page was checked against the primary source in September 2026. Regulations, designations and thresholds change, and nothing here is a substitute for advice on your own property or contract. If you spot something that has moved, tell us and we will correct it.
The sources are listed opposite. They are the published guidance and legislation themselves rather than a summary of them, so you can check any of it directly.
Common questions
Questions on this
Is building control the same as planning permission?
No, and one never covers the other. Planning is about what the building looks like and how it affects the area. Building control is about whether it stands up and is safe. An extension can be permitted development and still need full building regulations approval — most are.
Can I use a private inspector instead of the council?
For most domestic work, yes — but since 6 April 2024 they must be a registered building control approver with registered building inspectors doing the work. Ask for the registration before appointing. Higher-risk buildings have no private route at all.
What if previous work was never signed off?
It can be regularised, but to today's standard rather than the standard when it was built, and that usually means opening up work to prove what is underneath. It is worth finding out before you build on top of it rather than when the buyer's solicitor asks.
Who arranges building control on our jobs?
We do, as part of the contract, and we deal with the inspections. The application is made in the building owner's name because the duties sit with them, and the certificate comes to them at the end.
Where this applies
The work this affects
- Home extensions Single and two-storey rear, side and wraparound extensions, from first survey to building control sign-off.
- Structural works & underpinning Steels, load-bearing wall removal, underpinning and remedial work to existing structures.
- Full house renovations Whole-property refurbishment — strip out, first fix, second fix and finishes under one contract.
Start a conversation about your project
Tell us what you are planning. We will come out, look at it properly, and put a written quotation in front of you.